A hybrid metaheuristic method to optimize the total weighted tardiness and delivery cost for an integrated production and distribution scheduling model in supply chain management

Lin Zhao,Zhihao Peng,Poria Pirozmand
DOI: https://doi.org/10.3934/jimo.2024176
2024-11-29
Journal of Industrial and Management Optimization
Abstract:Supply Chain Management (SCM) is one of the issues that scholars have studied for many years, both theoretically and practically, and given the subject's breadth and variety, it has received a great deal of research and is still the focus of a great deal of study. An integrated production and distribution scheduling problem in a single customer mode for the 'production for an ordering' system in a supply chain is a subproblem of SCM. In this problem, a manufacturer receives orders from a customer and processes them on a machine then sends them to the customer in batches. Sending batches of orders will reduce delivery costs but may increase the lateness of some orders. The goal is to sequence the processing of tasks and determine their classification for delivery so that the total weight of tasks and delivery costs are minimized. In this paper, two new linear programming models, including Mixed-Integer Programming (MIP) and Mixed-Integer Nonlinear Programming (MINP) models, as well as a new Heuristic Algorithm (HA), are proposed to solve this Np-hard problem. In order to evaluate the performance of these three methods, computational tests have been performed using the experimental design of 8340 different case studies to show their effectiveness and speed in solving production and distribution scheduling problems in SCM. The experimental results show the efficiency of the HA that could solve 45.13% of problems with a maximum solving time of 0.05917s which is much faster than MIP and MINLP.
engineering, multidisciplinary,operations research & management science,mathematics, interdisciplinary applications
What problem does this paper attempt to address?