A branch and bound algorithm for single-machine production scheduling integrated with preventive maintenance planning

Shijin Wang,Ming Liu
DOI: https://doi.org/10.1080/00207543.2012.676683
IF: 9.018
2013-02-01
International Journal of Production Research
Abstract:This paper deals with an integrated optimisation model for production scheduling and preventive maintenance (PM) in a single machine with its time to failure subject to a Weibull probability distribution. The objective is to minimise the total expected weighted completion time of jobs. To solve this problem, we develop a branch and bound (B&B) algorithm (hereafter called the B&BA). Several lower bounds, dominance rules and upper bounds are developed to enhance the performance of the B&BA. Extensive computational experiments on randomly generated problems with different configurations are conducted and the results show that the proposed method can find optimal solutions for problems with up to 18 jobs in a reasonable amount of computation time.
engineering, manufacturing, industrial,operations research & management science
What problem does this paper attempt to address?