Interaction between cable-stayed bridge traveled by high-speed trains and continuously welded rail

戴公连,闫斌
2013-01-01
Abstract:To study the interaction between cable-stayed bridge traveled by high-speed trains and CWR (Continuously Welded Rail), nonlinear bar elements were used to simulate the track-bridge contact, and then the numerical simulation was compared with the UIC example to verify its correctness. Taking the (32+80+112)m single-tower cable-stayed bridge with U-shape section on the Shanghai-Kunming line as an example, a model was established by considering tower, cable, girder, track and neighboring structures. The distributions of the longitudinal forces of CWR and the horizontal forces at the top of piers were systematically analyzed under the actions of bending, braking, thermal effect, wind, shrinkage and creep as well as earthquake, and furthermore the design parameters were discussed. In the load combination method, the "step-by-step analysis" with the loading history considered was compared with the traditional "simple summation" method. The following conclusions are obtained: The track stresses at both ends of the cable-stayed bridge and at the bridge abutment are larger. The bending and braking force of rails may be significantly reduced by using the consolidation system. The shrinkage creep and seismic load have the greater influences on the longitudinal force of the track and the traveling wave effect of the earthquake motion can increase the track stress at the bridge abutment. For the substructure of bridge, the bending force, braking force and seismic force are mainly withstood by the tower, while the horizontal forces produced by the temperature and shrinkage creep are mainly taken by the piers at both ends of the cable-stayed bridge. When checking the longitudinal forces of the track, the simple summation method may be used, but when checking the piers, the loading step-by-step analysis with the loading history considered should be safer.
What problem does this paper attempt to address?