Study on broken plate force of ballastless track on high-speed railway long-span continuous beam bridge

DaiGonglian,Hao Ge,QiuYuanxi,LiuWenshuo
DOI: https://doi.org/10.13245/j.hust.150919
2015-01-01
Abstract:To investigate the mechanics characteristic of the CRTSII slab ballastless track on the long‐span continuous beam bridge of high‐speed railway under broken board force ,using finite element software MIDAS based on the principle of the interaction between the rail and bridge ,a space inte‐grated longitudinal force calculation model of the rail‐track board‐base plate‐beam‐pier was estab‐lished ,and the large span continuous beam bridge of (60 .75+3 × 100+60 .75) m of Changyu Lianshui section of Shanghai‐Kunming passenger transport line was taken as an example to calculate the distri‐bution and transmission rules of the relative displacement and longitudinal force of each layer under broken board force .The results show that the track board and bed plate are most likely fractured at the right end of continuous beam ,the incidental tensile stress at rail broken gap reaches its maximum to cause the broken rail ,the relative displacement of rail‐track board at the broken gap is large and the rail fastening will enter the plastic state and be pulled off ,the relative displacement of track board‐bed plate at the broken gap and solidification point of continuous beam will lead to cohere efficacy lose be‐tween the CA mortar layer and track plate ,the shear reinforcement of consolidation mechanism at both sides of the broken gap owns relatively large additional force and will be sheared ,and more than 70% longitudinal counter‐force of track structure is undertaken by the terminal spines at the left and right sides .
What problem does this paper attempt to address?