Cause Analysis and Treatment Measure on Electrolytic Capacitor False Action of Protection in Digital Substation

Li Tiecheng,Chen Haibin,Hao Xiaoguang
DOI: https://doi.org/10.3969/j.issn.1001-9898.2011.03.009
2011-01-01
Abstract:Aiming at phenomenon of large DC component of protection action,this paper considers that the cause of the failure is the use of hardware integral through simulation failure analysis in laboratory,and at last,puts forwards the settlement that is to use software integral,and analyzes the settlement result.
What problem does this paper attempt to address?