Design and Construction of Large Well Dewatering in Ultra-deep Foundation Excavation of Subway Stations

Fang Guangxiu,Ma Xiang,Luo Jiangbo
2012-01-01
Abstract:With the experience of the Excavation of Jinan West Station on Subway Line 6,this paper introduced the application of large well dewatering in ultra-deep foundation excavations.The site permeability coefficient was obtained by on-site water pumping test and calculated with partial well theory of stable underlying water.This provides the key hydrology parameter for the determination of the dewatering plan.The dewatering plan,design and construction of the dewatering well were then introduced in detail.The reliability of the proposed method was confirmed by monitoring of the moisture content of the foundation,sand ratio of the well water and the settlement or displacement of adjacent buildings.
What problem does this paper attempt to address?