Abstract:During the phase II development of PL19-3 oil field in Bohai Sea,the base of turbine generator package deformed after lifting it integrally onto the platform due to its overlarge size,overweight and over high center of gravity,so re-leveling the package is needed on the platform.Through modifying the current weighing system,we designed a controllable hydraulic jacking system with eight groups of control loops to control sixteen hydraulic jacks,which was used successfully for the re-leveling operation.Compared with the traditional manual hydraulic jacking method,the controllable hydraulic jacking system is characterized with continuous and simple technical process as well as high positioning precision,so it has high reference value to the similar projects later.