Research on the Seepage Stability of Sluice Foundation of Longfeng Hydropower Station

LIAO Ming-yu,ZHANG Li-yong,LUO Rong,WU Gang,CHEN Xian,LI L
DOI: https://doi.org/10.3969/j.issn.1000-1379.2013.09.038
2013-01-01
Abstract:As the high permeability foundation may lead to the seepage failure of sluice foundation,Longfeng Hydropower Station built vertical cutoff wall in the upstream of sluice and formed closed seepage control system deeply into the bedrock. The paper built three-dimensional seepage model by applying the software of ANSYS and analyzed the seepage characteristics of sluice foundation with and without cut-off wall. The results show that,in the absence of cut-off wall,seepage slope distributes evenly under the sluice foundation,and reaches the maximum at the blanket upstream and escape point downstream which is far bigger than the allowable value of sand and may happen seepage failure easily. Hydraulic head reduces only 87. 0% at the base plate which leads to the seepage slope value of escape point is bigger. With cut-off wall,seepage slope value of escape point in the downstream of floodgate is smaller and the reduction of all hydraulic head occurs at the parts of cut-off wall. Seepage slope value of escape point in the downstream of flushing sluice is smaller and the reduction of all hydraulic head occurs at the base plate,which can control seepage failure of the whole sluice section,showing building cut-off wall is necessary.
What problem does this paper attempt to address?