PTAS for a Two-machine Flow-shop Scheduling Problem with Release Dates and Transportation Times Delay

Xian-dong ZHANG
DOI: https://doi.org/10.3969/j.issn.0427-7104.2007.04.003
2007-01-01
Abstract:The NP-hard problem of scheduling n jobs on a two-machine flow shop with release dates and arbitrary transportation times was addressed.If transportations times are constrained,permutation schedules are proved to be optimal.A(1+ε) polynomial time approximation scheme(PTAS) is developed which is based on dynamic programming.
What problem does this paper attempt to address?