On Determination of Pile Length with Parallel Seismic Testing for Existing Structures

Chen Longzhu,Zhao Rongxin
DOI: https://doi.org/10.3969/j.issn.1673-0836.2010.01.029
2010-01-01
Abstract:The problems in determination of pile length with the parallel seismic testing(PST) for existing structures is firstly reviewed in this paper.A simplified model for the propagation path of the first-arrival P wave in the PST is then proposed to get the main features of time-versus-depth plot.When the measurement depth is big enough in the borehole nearby the pile,the plot usually involves two straight lines and the slope of upper one is related to the velocity of one dimensional P wave of pile shaft while that of lower one to the velocity of three dimensional P wave of soil beneath the pile tip.A reasonable method for pile length using PST is presented from the intersection point of the two lines,which is preliminarily verified with a FEM calculation in the literature.
What problem does this paper attempt to address?