Research on No-wait Hybrid Flowshop Scheduling Problem Based on Constraint Programming

LI Yan,LI Tie-ke
DOI: https://doi.org/10.3969/j.issn.1000-3932.2007.03.007
2007-01-01
Abstract:A constraint programming approach to the problem of k-stage hybrid flowshop scheduling on identical parallel machines with no-wait constraint to minimize makespan is presented.The objective and constraints of the problem are expressed naturally by the proposed model.The solving strategy,including employment of the depth-bounded discrepancy search procedure,the limited number of failures search strategy and the integration of discrete,unary and alternative resource to express machine requirements of jobs at each stage,is introduced.The constraint programming approach is validated by computation.The proposed method are capable of meeting the practical requirements both in efficiency and effect.
What problem does this paper attempt to address?