Analysis of overflowing phenomenon in water transfer channel of middle route of South-to-North Water Transfer Project

FANG Shen-guang,WU Bao-sheng,ZHAO Gang
DOI: https://doi.org/10.3880/j.issn.1006-7647.2007.04.003
2007-01-01
Abstract:In consideration of the fact of being lack of regulation reservoirs on the middle route of South-to-North Water Transfer Project,the overflowing phenomenon occurring in the upstream channel induced by closing down of a regulation gate at different flux change velocities was simulated by use of 1?D unsteady flow mathematical model.The results showed that the overflowing phenomenon occurred in front of the closed gate at first.With the increase of the flux change velocity of the flow passing the gate,the overflowing phenomenon occurred earlier,and the rise of water level in front of the gate during its closing period was of a linear relationship with the flux change velocity of the flow passing the gate.Therefore,under the real condition,it is necessary to close the gate as slowly as possible so that overflowing accidents could be avoided,and more time could be obtained to startup escape gates and other diversion facilities.
What problem does this paper attempt to address?