Recession Capacity of Discharge Outlet of Large Water Transfer Channels

吴保生,方神光,李玉荣,尚毅梓
DOI: https://doi.org/10.3880/j.issn.1006-7647.2008.01.015
2008-01-01
Abstract:With the Penghe and Lihe exit sluices in the main canal of the South-to-North Water Transfer Middle Route Project as examples,one-dimensional unsteady flow calculation software was adopted for simulating unsteady flow pattern in the main canal under different emergency conditions,and their recession capacities were analyzed and checked.The result shows that large fluctuation of water surface occurs when the gates at two ends of the canal are closed suddenly and simultaneously with the exit sluices not open.When the Caodunhe and Penghe controlling gates and the diversion gate in this section are closed simultaneously,overflow phenomenon does not occur in the canal under the design flux even if the exit sluices are closed.However,if the flux is increased,the overflow phenomenon can be avoided only if the two gates are opened for at least about 3 hours,and the longer the distance between two closed controlling gates,the more the operating time of the exit sluices.
What problem does this paper attempt to address?