Problem from Dam Foundation Grouting with Stable Grout for Qiafuqihai Water Control Project and Relevant Treatment Measures

白建军,胡智,耿凡坤,董阳光
DOI: https://doi.org/10.3969/j.issn.1000-0860.2009.03.015
2009-01-01
Abstract:After the foundation grouting with stable grout for the dam of Qiafuqihai Water Control Project,the problem of lifting deformation is observed,and then the grouting can not meet the original design standard;for which the relevant technical treatment measures are actually taken to solve the problem based on the analysis concerned.
What problem does this paper attempt to address?