STUDY ON KARST FOUNDATION STABILITY AND TREATMENT MEASUREMENTS FOR AIKOU ASPHALT CONCRETE CORE ROCKFILL DAM

Duan Ya-hui
Abstract:Evaluation method of foundation rock stability and treatment measurements in karst areas is studied.Grouting is a kind of reliable and effective method to improve anti-seepage capacity and stability of foundation.On account of characteristic of Aikou,foundation grouting treatment scheme is determined.The stability of foundation rock with different karst distributions is analyzed and compared.To ensure asphalt concrete core′s stability and safety,the dam foundation must be reinforced.Based on calculations,different treatment measurements to different depth karst foundations are determined as follows:3 groups of consolidation grouting holes should be arranged,the distance beween the adjacent groups is smaller and the depth of each group is deeper,group I hole distance is 12 m,depth 13–36 m(depth of river bed hole is 36 m,of dam toe,heel and abutment is 13 m),group hole II distance is 6 m,depth 13–21 m(depth of river bed hole is 21 m,of dam toe,heel and abutment is 13 m,group hole III distance is 3 m,depth 13 m.The stability of the treated dam foundation is calculated and compared,even big cave(beyond 50 m to dam foundation) were existed,the safety of the treated foundation can be ensured.It is proved that,with grouting treatment,work states of asphalt concrete core meet the request of engineering,and the treatment schemes are feasible and reliable.
Geology,Environmental Science,Engineering
What problem does this paper attempt to address?