Another new cooldown mode of EAST cryogenic system

Fu Bao,Zhu Ping,Zhuang Ming
DOI: https://doi.org/10.3969/j.issn.1001-7100.2010.03.003
2010-01-01
Abstract:The cryogenic system is an important subsystem of EAST tokamak,which has been cooled down for six times and commissioned successfully.The fourth cooling down campaign was finished in August,2008.This cooling down was different from the formers.Last three time cooling down campaigns were made by 4 turbines(turbine A,B,C and D),the turbine B,C and D were used to get liquid helium to cool the PF coils,TF coils,the 5 & 8 pairs current leads and buslines to the certainty temperature,and the turbine A was used to cool the thermal shield.Otherwise,the fourth cooling down is by 3 turbines(turbine A,B and C),the turbine B&C were to get liquid helium to cool the Toroidal Field(TF) magnets and Poloidal Field(PF) magnets and buslines to the certainty temperature,the turbine A was also to cool the thermal shield.In the fourth campaign it took about 20 days to cool all the coil from room temperature to liquid helium temperature.The starting-up process of turbine,magnet-cooling process and some experiment were given.
What problem does this paper attempt to address?