Predicting the Accumulated Number of Plugged Tubes in a Steam Generator Using Statistical Methodologies

Yuh-Ming Ferng,Chin Nan Fan,Bau Shei Pei,Hsuen-Nien Li
DOI: https://doi.org/10.1016/j.anucene.2008.03.010
IF: 1.9
2008-01-01
Annals of Nuclear Energy
Abstract:A steam generator (SG) plays a significant role not only with respect to the primary-to-secondary heat transfer but also as a fission product barrier to prevent the release of radionuclides. Tube plugging is an efficient way to avoid releasing radionuclides when SG tubes are severely degraded. However, this remedial action may cause the decrease of SG heat transfer capability, especially in transient or accident conditions. It is therefore crucial for the plant staff to understand the trend of plugged tubes for the SG operation and maintenance. Statistical methodologies are proposed in this paper to predict this trend. The accumulated numbers of SG plugged tubes versus the operation time are predicted using the Weibull and log–normal distributions, which correspond well with the plant measured data from a selected pressurized water reactor (PWR). With the help of these predictions, the accumulated number of SG plugged tubes can be reasonably extrapolated to the 40-year operation lifetime (or even longer than 40 years) of a PWR. This information can assist the plant policymakers to determine whether or when a SG must be replaced.
What problem does this paper attempt to address?