Analysis on Support Results of Different Pre-stressed Bolt/Anchor in Seam Gateway along Goaf of Fully Mechanized Top Coal Caving Mining Face

WANG Qing-di,JING Hong-wen,WANG Meng
DOI: https://doi.org/10.13199/j.cst.2009.09.13.wangqd.004
2009-01-01
Abstract:In order to effectively control the deformation failure occurred during the gateway driving period of the fully mechanized top coal caving mining face gateway along the goaf,under the condition of the in situ rock stress not considered,the FLAC3D calculation program was applied to simulate the distribution condition of the additional stress field in the surrounding rock under the three type support conditions with the bolt,anchor or bolt plus anchor with pre-stressed force applied.The paper analyzed the function mechanism of the bolt/anchor after pre-stressed to the surrounding rock.The paper calculated the support results of the gateway along the goaf with different pre-stressed values of the bolts.The site industrial trial showed that when the pre-tension force of the bolt reached at 30 kN,the deformation results of the surrounding rock in the gateway along the goaf would be good during the controlled driving period and also the surrounding rock deformation would be effectively controlled during the coal mining period.The research results could provide the theoretical and technical basis to ensure the stability of the seam gateway along the goaf during the gateway driving and the coal face mining period.
What problem does this paper attempt to address?