High Prestress Anchor Bolt Support Technology for Full Coal Roadway of Thick Coal Seam and Example Analysis

Hongpu Kang,Bin Yu,Zhiwen Yang,Jianfeng Zhou,Pengfei Jiang,Jinwang Song,Shengfu Dai,Zhibing Yang,Chengyu Zhang,Yang Pan
DOI: https://doi.org/10.19413/j.cnki.14-1117.2016.04.001
2016-01-01
Abstract:In view of a series of the problems that all of the anchors cann’t be anchored to the stable rock, the cross section of the roadway is large, the influence of the fully mechanized mining is strong in the thick top-coal roadway mining of Datong Coal Mine Group, based on the analysis of the anchoring performance of the anchors in the coal seams and the mechanism of the high prestress on the surrounding rock control of the full coal roadway, the high prestress anchor bolt support technology is studied, the support design and support effect analysis for the difficult complex roadway that the influence of the igneous rock intrusion on the crushed surrounding rock, the influence of the strong pressure on the roadway with the large cross section and the influence of the deep pressure on the roadway are carried on. The results of the applications in Tashan Mine and Majialiang Mine show that the high prestress anchor bolt support technology can effectively control the strong deformation of the full coal roadway of the thick coal seam and meet the requirements of safe and efficient production of coal mine.
What problem does this paper attempt to address?