Stability Analysis of Remnant Pillars Recovery under Weak Rock in Sanshandao Gold Mine

LIU Zhi-yi,ZHAO Guo-yan,ZHOU Tao,WANG Ze-wei,PENG Kang
DOI: https://doi.org/10.3969/j.issn.0253-6099.2013.04.002
2013-01-01
Abstract:For effectively stopping remnant roof and bottom pillars in Sanshandao Gold Mine,the stability analysis was conducted for the recovery process of remnant pillars under weak rock by using theoretical mechanics and numerical simulation methods.After the computation model was established based on the theoretical mechanics,the modified natural arch theory was applied to calculate load on the top of the access and the internal pressure of the loaded layer in the course of mining was analyzed for the different access with mathematical analytical method.A fitting function between the half width of the mining access and the thickness of the loaded layer was established,obtaining the minimum safe thickness of the reserved original rock required on the roof of the access with different span.The plastic deformation and roof stress were analyzed with ABAQUS software for different accesses during the excavation process,the proper mining height for the access and the safe thickness of the reserved original rock,and possible roof caving for the access with different span were all consequently calculated.It was concluded that the width and height of access to the stope are 1.5 m and 1.6 m,respectively.Results from theoretical mechanics analysis and numerical simulation analysis were applied into the remnant pillars recovery in Sanshandao Gold Mine with displacement monitored in the along-vein workings,showing safe production in the tested stope can be ensured.
What problem does this paper attempt to address?