Semiconductor Assembly and Test Production Line Modeling and Simulation Based on CONWIP

ZHAO Xiao,XIONG Fei,LI Jing,LI Jing-min,YAO Jin
DOI: https://doi.org/10.3969/j.issn.1001-3997.2013.09.001
2013-01-01
Abstract:Constant healthy work in process quantity is usually calculated by engineers based on their experiences when CONWIP policy is applied in semiconductor assembly and test production line of the A corporation,which may cause the quantity of work in process is not appropriate.In view of problem above,it models the semiconductor assembly and test production line(ATPL)and simulates the model with independent variable CONWIP and dependent variable cycle time.The simulation result suggests that the simulation model have established can excellently reflects the characters of ATPL and constant healthy work in process quantity scope and can be decided by the model simulation,which can offer data support to production activities and improve decision-making efficiency.
What problem does this paper attempt to address?