Research on the Short-term Optimal Scheduling of Cascade Hydropower Plants based on Improved Particle Swarm Optimization

Feng Yanmin,Li Chengjun,Zhang Xueyuan
DOI: https://doi.org/10.3969/j.issn.0559-9342.2009.04.008
2009-01-01
Abstract:Improved Particle Swarm Optimization is applied to short-term optimal scheduling of the cascade hydropower plants.Maximum integrated profit model of short-term optimal scheduling of cascade hydropower plants based on peak and valley price considering both the profit of generation and the water-effective is established.In order to overcome the shortcomings of standard Particle Swarm Optimization,for example,precocity and slow later convergence,shrinkage factor and across operator are adopted in the study.Improved Particle Swarm Optimization is applied to short-term optimal scheduling of the cascade hydropower plants of the Qingjiang River,it calculate by the traditional model and the modle based on peak and valley price,the results show that implementing peak and valley price has a higher value for improving the integrated profit of cascade hydropower plants,reasonable use of water resources and easing the tensions in the peak period of electricity consumption;it has a satisfactory effect both in the solving time and the accuracy of the results for applying the improved Particle Swarm Optimization to solve the problem of the short-term optimal scheduling of cascade hydropower plants.
What problem does this paper attempt to address?