Algorithm Study for Short-term Optimal Operation of Cascade Hydropower Stations

马光文,黄炜斌,尤渺,古家平
DOI: https://doi.org/10.3969/j.issn.0559-9342.2013.12.018
2013-01-01
Abstract:With the continuous putting into operation of cascade hydropower stations, the problems with multi-dimensional, multiobjective and multi-constraint characteristics are more and more prominent in the short-term optimal operation of cascade hydropower stations. Under the condition of TOU power pricing, the peak-normal-valley output ratio constraint of power grid should be considered emphatically. Focusing on maximizing the cascade generation profits, the algorithm for short-term optimal operation of cascade hydropower stations is researched and the fixed output algorithm is used with the combination of POA, in which, after the peak-normal-valley output ratio is dispersed, the dispatch process is firstly found when keeping output ration, and then the POA is applied to select the best result. An application example shows that this algorithm can effectively solve the shortterm optimal operation of cascade hydropower stations with multi-dimensional and multi- constraint conditions, and the operation results are good in practicality and operability.
What problem does this paper attempt to address?