2-D numerical simulation of water level at Yichang maintained by river bottom protection and roughness addition and pool back-fill

HUANG Fang-zhen,WANG Hong,SHAO Xue-jun
DOI: https://doi.org/10.3969/j.issn.1009-640X.2005.04.011
2005-01-01
Abstract:Effects of maintenance and raise of water level at Yichang Station by river bottom protection and roughness addition method and pool back-fill method in the reach from Yichang to Zhicheng of the Changjiang River are calculated and compared by using a 2-D flow numerical simulation method.Calculation results show that each regulation measure can meet demands.
What problem does this paper attempt to address?