Simulation of Monthly Runoff Considering Flow Components in Yarlung Zangbo River

Zhichao ZHAO,Qiang FU,Chao GAO,Xujie ZHANG,Yueping XU
DOI: https://doi.org/10.3969/j.issn.1000-0852.2017.02.005
2017-01-01
Abstract:The semi-distributed hydrological model SWAT was built for the Yarlung Zangbo River Basin.After calibration (1989-1998) and validation (1999-2005),the monthly runoffwas simulated at three hydrological stations (Nugesha,Yangcun,Nuxia).We selected two sets of parameters to analyze the performance of SWAT model dhrough Nash-Sutcliffe Efficiency (NS),determination coefficient (R2) and relative error (PBIAS).The results show that for Parameter Set 1,R2 at three stations were as high as 0.9,NS were 0.9,0.92 and 0.72,PBIA S were 7.1%,18.5% and 34.2%respectively during the calibration.However,the simulations of runoff components are unrealistic.For Parameter Set 2,although the evaluation indexes were not very high,its runoff components are reasonable.This is the same case during the validation.Therefore,it is recommended that the simulation skills of runoff components be considered during model calibration and validation.
What problem does this paper attempt to address?