Dynamic Analysis on CRD Method for Subway Tunnel Under-passing Flyover Bridges in Water-soaked Quick Sand Stratum of Shenzhen Subway Line 4

ZHAO Yu-bao,CHEN Shou-gen,ZHANG Heng,DENG Xi-fei
DOI: https://doi.org/10.3969/j.issn.1003-8825.2012.01.029
2012-01-01
Abstract:Subway tunnel between mileages K9+125 and K9+255 on Shenzhen Subway Line 4 is embedded in water-soaked quick-sand stratum.The rock mass has little stand-up time and the tunnel passes the flyover bridges with many pipelines passed over it.Tunnel construction faced a big risk and surrounding rock deformation must be minimized.Based on the field monitoring data incorporating numerical analysis,the CRD method excavation is analyzed dynamically.The research indicates that temporary supports constructed as soon as possible can inhibit the early settlement of unclosed structure meanwhile the maximum displacement of the structure by about 40 % when they are dismantled.The arch crown subsidence caused by each heading excavation is distributed well,which could be used as an indicator to forecast;and the supervision of arch crown subsidence should be focused on heading CRD1 which was excavated firstly.
What problem does this paper attempt to address?