Deformation Cotrol Techniques for Surrounding Soils of a Subway Tunnel Under-passing Flyover Bridges and Gas-pipe Lines in Water-soaked Quick Sand Stratum

Deng Xifei,Chen Shougen,Zhang Heng,Wang Jinghua
DOI: https://doi.org/10.3969/j.issn.1009-6582.2010.04.020
2010-01-01
Abstract:Subway tunnel between mileages K9+125 and K9+255 on Shenzhen subway Line 4 is embedded in water-soaked quick-sand stratum,and it underpasses flyover bridges with the minimum distance of 5.46 m between the tunnel and friction piles,with many pipelines passed over it.Tunnel construction faced a big risk and surrounding soil deformation must be minimized.Considering the features of this project,this paper studied and summarised technologies including friction piles strengthened by sleeve-valve tube grouting and pipe-shed sup-port,two-phase surrounding soil deformation control through high pressure rotating-jet-grout water-stop curtains conducted on ground surface and pipe-roofing and small pipe grouting performed inside the tunnel,tunnel face plugging,CRD excavation method,drainage etc.The study is of help to similar underground projects.
What problem does this paper attempt to address?