Analysis of Terrain Affecting on Building Collapse Result

刘翼,崔晓荣,李战军
DOI: https://doi.org/10.3963/j.issn.1001-487x.2010.03.032
2010-01-01
Abstract:The Dongyangge hotel with 23 floors in Shenyang was demolished by explosive with equidirectional folding and collapsing in situ and firing from down to up,which has two blast cuts and three disintegrate compress zones,but there are not 5 floors completely collapsed.Through observating blasting TV repeatly and with the blasting design and muck shape,the collapsing process was studied and the results are there was large quantity construction garbage cumulation about 2~3 m high,5 m ahead of building.Owing to the ahead resistance caused by no moving of blast mucks during down sitting,and the back blast mucks can freely extrude and then no supporting leading to overturn,so there are 5 floors callapsed imperfectly at last.
What problem does this paper attempt to address?