BLASTING DEMOLITION OF A 17-STOREY BUILDING IN SHEAR WALL STRUCTURE

Ning ZHOU,Zhao-wu SHEN,Ting-qing ZHOU,Hui-ying ZHAO,Cheng-bing LI,Xiao-rong CUI,Hong-hao MA,Qun MEI,Yong LUO
DOI: https://doi.org/10.3969/j.issn.1006-7051.2006.03.014
2006-01-01
Abstract:The paper introduced a practical example of successful demolition of a 17-storey building in reinforced conrete shear wall structure by controlled blasting.Because of restricted surroundings,the muckpile must be controlled,which suggested a blasting program combining controlled blasting with collapsing in situ should be employed.In order to ensure the vertical collapse,complete disintegration and a minimized muckpile area,some technological measures such as preliminary demolition,drilling and charging in each floor were taken,and for diminishing blasting damage,down-hole second blasting and out-hole millisecond blasting were used to reduce charge quantity in single shot.The blasting reached very ideal result and verified the technologies designed in this project.
What problem does this paper attempt to address?