Experiment on Effect of Artificial Roughness on Water Flow Characteristic

Zu-tao WEI,Ke-bin SHI,Cheng-lin CHEN,Heng-yang YANG
2010-01-01
Abstract:The spillway is a very important structure in a hydro project.To ensure the stability of high velocity flow in the trench,so straight spillway is designed.However,excavation quantity and terrain condition are not suit for straight spillway to built,so that curved spillway is inevitable.The flow patterns of high velocity flow in curved spillway is bad because of the flow concentration in concave side of the bank then strike into the straight part of the spillway as well as the wall of that.So engineering measures are necessary to keep cueved spilway and downstream flow static.
What problem does this paper attempt to address?