Investigation of Highway Bridge Load Effect for Fatigue Reliability Analysis

Xiaoyan SUN,Chong XU,Hailong WANG,Zhijun ZHENG
DOI: https://doi.org/10.3969/j.issn.1002-0268.2011.05.015
2011-01-01
Journal of Highway and Transportation Research and Development
Abstract:The on-site survey from Fudian Road indicated that overloaded vehicles account for a significant high proportion of the overall traffic volume.Therefore,fatigue load spectra in normal traffic state and intensive traffic state were simulated based on this information.The stress time history curves of steel rebar and concrete in two states were obtained though highway bridge load effect analysis.Stress range spectrum Δσ-ni was obtained by using rain-flow counting method.According to linear accumulative damage criteria,the equation for equivalent stress range Δσe was derived and ratio of load effect was defined for practical application on bridge fatigue reliability analysis.The simulation shows that the absolute value of load effect under intensive traffic state is larger than that of normal traffic state with same vehicle queue,while the equivalent stress range is smaller than that of normal traffic state due to the sustained high stress under intensive traffic state and the smaller stress difference in the critical section of bridge member.
What problem does this paper attempt to address?