Research and Application of Integrated Planning and Scheduling Framework for DHCR and DR

XU Jian,L(U) Zhi-min,XU Jin-wu,ZHU Zhi-rong,WANG ling
DOI: https://doi.org/10.3321/j.issn:0449-749x.2005.12.014
2005-01-01
Abstract:The three-layer framework of integrated planning and scheduling for DHCR and DR(direct hot charging rolling and direct rolling) is proposed according to the characteristics of DHCR and DR process.Three-layer framework consists of batch-planning layer,task-scheduling layer and dynamic scheduling layer.Batch-planning layer includes an order-planning optimization module and an integrated batch-planning optimization module,task-scheduling layer includes a task-scheduling optimization module,and the dynamic scheduling layer includes a dynamic scheduling main-controlling module based on rules and a real-time controller.Furthermore,the structure,function,feature and some design ideas of every layer are also analyzed.Finally,the DHCR production management system of the Second Hot Rolling Plant at WISCO(Wuhan Iron and Steel(Group) Corp.) based on three-layer framework is put forward.With help of DHCR production management system,75% of products are produced by DHCR(average charging temperature exceeds 700 ℃),heating-furnace productivity is increased by 30%and at the same time planning and scheduling time are greatly shortened.The results show that the framework is effective.
What problem does this paper attempt to address?