Slab Cluster Based Planning and Scheduling Method of Cc-Dhcr

Sujian Li,Helan Liang,Yanjun Huang,Bo Hu
DOI: https://doi.org/10.1109/icacc.2009.79
2008-01-01
Journal of Advanced Manufacturing Systems
Abstract:Focusing on the limitations of the traditional Continuous Casting-Direct Hot Charge Rolling (CC-DHCR) planning and scheduling methods that rarely consider dynamic scheduling problems, a new method is put forward. The key idea is to make out clusters and integrated plans in the planning layer, and then to adjust the rolling sequences according to the slab cluster-based strategy in the dynamic scheduling layer. Results of the test with data from practical production process show that the method can effectively solve the CC-DHCR planning and scheduling problem and increase the DHCR ratio.