Dynamic Simulation Research of Full Startup Procedure of GE 9FA Heavy-Duty Gas Turbines Using SIMULINK

ZHANG Wen-jie,LIU Shang-ming,PU Xing-xing,WEI Cheng-liang
DOI: https://doi.org/10.3969/j.issn.1672-5549.2011.02.012
2011-01-01
Abstract:This paper focuses on the modeling of the startup process of GE 9FA heavy-duty gas turbines.A simplified way has been adopted to estimate the performance of compressor in low speed range.A simulation model for full startup simulation of GE 9FA heavy-duty gas turbines has been constructed in Matlab/SIMULINK.The simulation results match with the field data and confirm the accuracy of the simulation model in full startup procedure.The results show that the model can satisfy the accuracy requirements in gas turbine system simulation.
What problem does this paper attempt to address?