Research of Earliness/tardiness Problem in Fuzzy Job-Shop Scheduling

Bing-yuan LU,Hua-ping CHEN,Feng GU,Shu YANG
DOI: https://doi.org/10.3969/j.issn.1000-5781.2006.06.014
2006-01-01
Abstract:The fuzzy operational duration and fuzzy due date problems in the practical job-shop scheduling environment are introduced in this paper firstly.Then the signed distance,the interval numbers distance and corresponding concepts are described.After that,to deal with the earliness/tardiness penalty problems,an improved genetic optimization approach is used to frame the job_shop scheduling model which is based on fuzzy numbers signed distance and interval numbers distance.At last,the simulating experiments are given to approve its feasibility and efficency.