Optimal Common Due-Date and Optimal Job Scheduling in Parallel Machine Scheduling Problem

LIU Min,WU Cheng,ZHANG Long
DOI: https://doi.org/10.3321/j.issn:1000-0054.1999.09.031
1999-01-01
Abstract:The study on earliness/tarliness scheduling problem is focused on single machine situation and main methods proposed are heuristic procedures. In order to solve parallel machine earliness/tardiness scheduling problem with undetermined common due date effectively, a kind of genetic algorithm based on sectional coding was presented, the genetic code could reflect the scheduling policy and common due date simultaneously, the methods of the generation of the initial population, crossover and mutation were researched. Computational results show that the genetic algorithm proposed has good performance, and that the quality of its solution is advantageous over heuristic procedure, and that it is suitable for large scale parallel machine earliness/tarliness optimization scheduling problem.
What problem does this paper attempt to address?