HYBRID GENETIC ALGORITHM METHOD FOR IDENTICAL PARALLEL MACHINE EARLINESS/TARDINESS SCHEDULING PROBLEM

LIU Min,WU Cheng
DOI: https://doi.org/10.16383/j.aas.2000.02.018
2000-01-01
ACTA AUTOMATICA SINICA
Abstract:Identical parallel machine earliness/tardiness scheduling problem with common due date is studied.A kind of hybrid genetic algorithm is presented to determine the common due date,job code,and processing orders of every processed job on each machine,that is,find an optimal common due date and optimal scheduling policy for minimizing the total cost of assignment of due date,early delivery and tardy delivery.Numerical computations show that the hybrid genetic algorithm has advantage over heuristic procedure,and is fit for larger scale identical parallel machine earliness/tardiness scheduling problem.The algorithm proposed has low computational complexity and strong robustness.
What problem does this paper attempt to address?