Design and operation performance analysis of bathroom in asepsis ward

Sun Luchun,Gong Wei,Yang Caiqing,Chen Fengna,Yang Xudong
DOI: https://doi.org/10.3969/j.issn.1002-8501.2009.09.029
2009-01-01
Abstract:Presents the composition of clean air conditioning system of the project,the optimized selection of the design parameter indexes,and the experimental and numerical simulation results.During the operation process after construction,various measures are applied to test and evaluate the parameter indexes.The results indicate that the system of the project runs at good state and achieves the desired effect.