Research on Dislocation Monitoring for Shield Tunnel Segments with Straight Joint

Qiang ZHANG,Shou-ji DU,Ming-jian LU
DOI: https://doi.org/10.3969/j.issn.1673-0836.2008.01.027
2008-01-01
Abstract:With the development of shield tunnel technique and solution of some problems,the problems such as segment crack,difficulty in connection,and waterproof trouble are becoming more serious and obvious.These problems may impact the construction and its application directly.This paper is based on the shield tunnel project in the west line of the Rail Traffic Line NO.2 in Shanghai,and the dislocation of the shield segments in the jacking process is surveyed on the spot.After the surveying,calculation of the surveying data,drawing figures and data comparison,some regularity and characters of the segment dislocation are worked out,including the relationship between them and the related factors such as jacking force.So this paper may provide some rules to avoid shield segment dislocation in the jacking process,ensuring the constructing precision and improving the construction quality.
What problem does this paper attempt to address?