Calculating Method of Intergreen Interval for Roundabout

MA Ying-ying,YANG Xiao-guang,ZENG Ying
DOI: https://doi.org/10.3969/j.issn.1002-0268.2007.07.022
2007-01-01
Journal of Highway and Transportation Research and Development
Abstract:The interval between phases of roundabout are transformed into three parts,which are intergreen intervals between left-turns in roundabout,the straights in the same phase,and the straights in the next phase.A calculation method for intergreen interval of roundabout is put forward based on the potential conflict pot and starting wave in the intersection.It is applied in Lianban intersection in Xiamen.The result of the study is important to improve the efficiency and safety of roundabout.
What problem does this paper attempt to address?