Creep Time Dependent Analysis and Control of Long Span Continuous Rigid Frame Bridge of Urban Rail Transit

He Xuhui,Zhu Lijun,Yu Zhiwu
DOI: https://doi.org/10.3969/j.issn.1007-869x.2009.04.005
2009-01-01
Abstract:Concrete creep seriously influences the long-term performance of the prestressed concrete continuous frame bridge.In this paper,based on the"age-adjusted valid modulus" method,a formula to calculate the axial force and the moment increment is presented.Based on the Shawan Bridge on Guangzhou metro Line 4,by using the creep model of CEB-FIP(MC90) and the time dependent finite element method of age-adjusted effective modulus,the deformation and internal force within 3 years after the completion are analysed and compared with the measuring outcomes of the bridge in the past 3 years.Finally,this paper explores the law of creep deformation and the change of inner force for the continuous rigid frame bridges.
What problem does this paper attempt to address?