Abstract:A complete scheme for solving the key scientific problems associated with high-standard, high-intensity continuous construction of high arch dams was presented. First, based on a coupling analysis of construction system decomposition and coordination for a high arc dam, a mathematical model for real-time control of construction quality and progress that considers complex constraints was developed. Second, a method of progress control was proposed based on a dynamic simulation. Third, a dynamic quality control mechanism was established based on construction information collected using a PDA. Fourth, a system for integrating collected information, progress simulation and quality control analyses under a network environment was developed. Finally, these methods were applied to a practical project to show that each aspect of a construction process can be managed effectively and that real-time monitoring and feedback control can be realized. Our methods provide new theoretical principles and technical measures for quality and progress control in the high arc dam construction process.
What problem does this paper attempt to address?