Optimum Method for Horizontal Curve Re-Surveying of the Existing Railway

CHEN Feng,GU Liang-yao,YANG Yue,WU Xiang-hua
DOI: https://doi.org/10.3969/j.issn.1672-7029.2012.05.017
2012-01-01
Abstract:After using coordinate method for existing railway re-survey,according to continuous geodetic coordinate points of measuring curves,it is a very important job to do optimization calculation on existing railway.Based on the discussions of the distinguish basis of the plane curve feature dividing points,principle and insufficient of least square fitting calculation model for circular curve were analyzed.By establishing adjustment quantity calculation models of straight line between curves,transition curve and circular curve,plane curve adjustment quantity optimization model was established with least square fitting of the straight line between curves as the breakthrough point,with minimum curve adjustment quantity as optimization target and with circular curve radius and length of transition curve as optimization parameter,and one-time optimization calculation of continuous multiple plane curves can be done by continuity of straight line between curves.Using fixed step iterative method for optimization model solution,curves element eigenvalues of existing railway and adjustment quantity of the measuring points were obtained by optimization calculation.Calculation results show that optimization model algorithm is simple and effective,and can be applied in the various types of plane curves,and the pathological results of using least square fitting method on long radius circular curve can be effectively avoided.
What problem does this paper attempt to address?