Hydraulic Model Test Study of Import and Export of Hill Top Tunnel

赵经华,王长新,侍克斌,陈亮亮,庞毅
DOI: https://doi.org/10.3969/j.issn.1006-7175.2009.11.012
2009-01-01
Abstract:Through the hydraulic model test about import and export of Hill Top Tunnel to verify the flow conditions of the stilling basin of import and export in all kinds of tunnel and the effect of energy dissipation and the possible impact of the erosion of flow channels on the lower reaches;tunnel test measured the basic steady flow in the import and export,tunnel stilling basin export terminal velocity is not and will not have a great impact on the downstream channel erosion damage.
What problem does this paper attempt to address?