STUDY ON 3D PHYSICAL MODEL TEST OF SEEPAGE OF DEEP-BURIED LONG AND LARGE DIVERSION TUNNEL

王克忠,李仲奎
DOI: https://doi.org/10.3321/j.issn:1000-6915.2009.04.010
2009-01-01
Abstract:Geomechanical physical model test is one of the main methods to solve underground engineering problems. Based on the diversion tunnel project of Jinping II Hydropower Station,physical simulation of the construction process of deep-buried long and large diversion tunnel under high seepage pressure is conducted. The hydraulic serve-controlled water supply system and discrete holey tube seepage generation system are designed and made to realize the high simulation of seepage field. Calculation analyses of the seepage and evolution law inside the surrounding rocks of diversion tunnels during dynamic construction process are conducted. The scientific rationality of the model seepage test system is proved by the comparison of the calculated and measured results of osmotic pressure of characteristic points inside the solid model. According to experimental results,the theoretical basis for the anti-seepage construction technology design of diversion tunnels is provided;and it is of great significance for the long-term stability,safety evaluation and prediction of diversion tunnels.
What problem does this paper attempt to address?