Numerical modeling study on predicting water yield of fracture-karst planned iron mine

LIU De-peng,YANG Yun,LI Jin-hua,MA Yu-kuan,ZENG Zi-hua
DOI: https://doi.org/10.3969/j.issn.1674-3636.2012.04.428
2012-01-01
Abstract:How to accurately predict water gushing of mine which was studied in the text because it was the main threat for the safety of mine production.In the study,the authors built a hydrogeological conceptual model and a groundwater mathematical simulation model to depict the site characteristics and groundwater system of a planning construction iron mine.Based on the simulation model,calculation of water yield of the mine at-400 m,-500 m and-600 m levels was simulated by means of finite-difference methods.The prediction results indicated that the numerical simulation technique could be used to describe the groundwater system of the mine,presented a recognition of original gushing water,and served as guide for actual mine production and optimum distribution of water quantity.
What problem does this paper attempt to address?