Simulation analysis of coal mining influence on surface streams in Dingji coal mine

Wen-shun LI,Rui-ya ZHANG,Wu XIAO,Hui-ling CHEN,Xing-yu LI
DOI: https://doi.org/10.11799/ce201611024
2016-01-01
Abstract:According to the engineering background of Dingji Coal Mine, this paper predicted the mining subsidence from 2014 to 2035. Based on ArcGIS, original surface topography in 2014 was considered into the simulation of surface subsidence after mining, and DEM were contracted both in 2014 and 2035. Then, surface streams and their features in 2014 and 2035 were extracted and analyzed respectively using the hydrology analysis module . According to the comparison, the underground mining resulted in big changes of topography which affected flow direction and total stream length in different levels. The number of main streams decreased. The length of longest stream reduced. The direction of one stream even reversed. The catchment basin also combined, extended or shrunk, which would alter original special distribution of water catchment.
What problem does this paper attempt to address?