Simulation and analysis of land reclamation basing upon grid method

Huiling Chen,Wu Xiao,Zheng Wang,Sucui Li,Xiaoli Tai
DOI: https://doi.org/10.3969/j.issn.1006-530X.2015.09.036
2015-01-01
Abstract:For sufficient coupling between ground reclamation and underground mining,the authors explored a new method of land reclamation which took a mining area of China eastern high ground-water level area as subj ect of the study. The ground was divided into grid cells by grid method. The authors established computational model of coal seam region which influential the ground grid cells during mining. Basing upon the model,influential underground coal seam region of grid cell A(i,j )was delineated. Then,the authors conducted mining subsidence simu-lation by using probability integral method and analyzed subsidence characteristics and patterns of grid cell A(i,j )at each mining stage. The results showed that grid cell A(i,j )should take meas-ures of topsoil stripping at second stage. According to land reclamation method of ground-under-ground-ground,reclamation region was scientifically delimited and ground and underground were achieved sufficient coupling between ground reclamation and underground mining.
What problem does this paper attempt to address?