Laboratory Investigation on Cutoff Effect of Underground Structure to Groundwater Seepage of Aquifer

Zheng Pin,Xu Yeshuang,Shen Shuilong
DOI: https://doi.org/10.3969/j.issn.1673-0836.2011.02.007
2011-01-01
Abstract:With the development of urbanization,more and more underground structures are constructed in the soft deposit along coastal region.These underground structures will cut off the flow of groundwater and obstruct the replenishment of groundwater.In order to investigate the cutoff behavior of underground structure to groundwater flow through impervious wall,a series of laboratory tests was conducted.Test results show that the wall changes the distribution of groundwater level and delays the steady period of groundwater seepage.The relationship between the buried depth of the wall and the increment of hydraulic gradient can be represented by exponential curve.The optimal insertion depth ratio of the wall(ratio of the buried depth over the thickness of soil layer) for reduction of cutoff effect is about 70%.
What problem does this paper attempt to address?