Numerical Simulation for Cut-and-Fill Mining Process of Fengshan Mining District

Zhang Xuemin,Ding Jingang,Liu Baochen
DOI: https://doi.org/10.3321/j.issn:1001-1250.2007.01.004
2007-01-01
Abstract:To compare the effect of different cut-and-fill mining methods on the stope stability,numerical analysis was made,based on site investigation and in-door test,of the orebody mining and filling process in a 260 m~ 380 m range by finite element method,from which the stress field and yield distribution law in every stage of construction was obtained.The results show that combined application of cemented fill and tailings fill can effectively control the stability of the stope wall rock.In each step of the construction,the stress field and yield area are first increased due to the excavation effect and then decreased due to the filling action,and this change synchronizes with the construction advance.On the whole,the stress field and yield area have a trend of becoming larger.The filling body especially the cemented one can effectively depress the release and deformation of the stress of wall rock,which relaxes the release rate of the stratum-preserved energy,thus avoiding the occurrence of the dynamic pressure such as impact pressure.The scheme comparison shows that mining along the direction vertical to the orebody dip is the optimum.
What problem does this paper attempt to address?